COPEL

Complete Commissioning of the SE Ibema 138 kV (Yard Equipment, Auxiliary Services, Cabling, SPCS)

STATE GRID (CET)

Complete Executive Project SE TCP (GIS) 138kV, Distribution Line 138 kV; EL SE Porto (Copel)

ELETROSUL (TSLE)

Owner Engineering – SE Santa Vitória do Palmar 525/138 kV – TF2

ELETROSUL

Commissioning Supervision SE Siderópolis

ELETRONORTE

Basic Design SE Utinga – Replacement TR3 e TR4 230 kV

ELETRONORTE

Basic Design – SPCS – Substation Modernization 500 kV Imperatriz, Presidente Dutra and São Luís II – Maranhão, and Subestation Marabá – Pará

ELETRONORTE

Basic Design SE Presidente Dutra – Modernization of the Reactor Bank and equipment

of the span yard LT Imperatriz C2 and central span

ELETRONORTE

Basic Design SE Marabá – Modernization of Series Capacitor Bank, yard equipment and reactor span LT Tucuruí C2, Central span Equipment, yard and reactor equipment span LT Imperatriz C1

ELETRONORTE

Quality Control – Project Approval, Adequacy Reports Approval, TAF and TAC Follow-up 

ASSÚ TRANSMISSORA

Owner Engineering – Geração Mendubim – 1 EL 230 kV

ASSÚ TRANSMISSORA

Owner Engineering – Dunas Transmissora – 2 EL 230 kV

GE/VOLTALIA

Complete Executive Project – LT 500 kV – SE Coletora – SE Arinos

VOLTALIA

Complete Executive Project – SE Serra do Mel Expansion – Installation of TR4 500/34,5

EPC

Client

Enterprise

SIEMENS / BRASNORTE

SE JUBA – 230 kV

SIEMENS / BRASNORTE

SE BRASNORTE – 230 kV

ETEM

SE CUIABA – 230 kV

ETEM

SE NOBRES – 230 kV

ETEM

SE NOVA MUTUM – 230 kV

ETVG

SE VÁRZEA GRANDE – 230 kV

TAESA

Expansion SE RIO GRANDE II 230/138kV

São Pedro Transmissora

Exp SE GILBUÉS II 500kV

São João Transmissora

SE SJP 500kV + Exp

Triângulo Mineiro Transmissora (FURNAS)

SE Assis – 500 kV

Triângulo Mineiro Transmissora (FURNAS)

SE Marimbondo II – 500 kV

São Pedro Transmissora (AMBAR/ TAESA)

SE Barreiras II – 500/230 kV

São João Transmissora (AMBAR / TAESA)

SE São João do Piauí – 500 kV

LEST ( Vinci Partners)

SE XINGÓ/ JARDIM / PAULO AFONSO / LUIZ GONZAGA – (Assembly and Commissioning)

Interligação Elétrica Aimorés

SE PADRE PARAÍSO 2 – 500kV –Lote 4 Leilão Aneel 013/2015

Água Vermelha Transmissora (Vinci)

SVC – Lote 5 – Leilão Aneel 013/2015

TAESA

SE BARREIRAS II – Authorization Resolution for the implantation of the second transformer bank 500/230kV 150MVA

Assú Transmissora de Energia S.A(CEPAR)

SE ASSÚ 500KV – Implementation of 2 Transformer Banks 500/230KV 1.800 MVA + 3 Sectioning (2 CHESF e 1 TAESA)

VOLTALIA

SE SERRA DO MEL – Construction and Assembly of a 500kV bay with a 500/34,5kV Transformer and 36 feeders

CCINFRA / EDP

SE CHACHOEIRA PAULSITA. Electromechanical Assembly and Commissioning

CCINFRA / EDP

SE ESTREITO . Electromechanical Assembly and Commissioning