More than 40 undertakings in the electrical sector nationwide
Client | Enterprise |
---|---|
COPEL | Complete Commissioning of the SE Ibema 138 kV (Yard Equipment, Auxiliary Services, Cabling, SPCS) |
STATE GRID (CET) | Complete Executive Project SE TCP (GIS) 138kV, Distribution Line 138 kV; EL SE Porto (Copel) |
ELETROSUL (TSLE) | Owner Engineering – SE Santa Vitória do Palmar 525/138 kV – TF2 |
ELETROSUL | Commissioning Supervision SE Siderópolis |
ELETRONORTE | Basic Design SE Utinga – Replacement TR3 e TR4 230 kV |
ELETRONORTE | Basic Design – SPCS – Substation Modernization 500 kV Imperatriz, Presidente Dutra and São Luís II – Maranhão, and Subestation Marabá – Pará |
ELETRONORTE | Basic Design SE Presidente Dutra – Modernization of the Reactor Bank and equipment of the span yard LT Imperatriz C2 and central span |
ELETRONORTE | Basic Design SE Marabá – Modernization of Series Capacitor Bank, yard equipment and reactor span LT Tucuruí C2, Central span Equipment, yard and reactor equipment span LT Imperatriz C1 |
ELETRONORTE | Quality Control – Project Approval, Adequacy Reports Approval, TAF and TAC Follow-up |
ASSÚ TRANSMISSORA | Owner Engineering – Geração Mendubim – 1 EL 230 kV |
ASSÚ TRANSMISSORA | Owner Engineering – Dunas Transmissora – 2 EL 230 kV |
GE/VOLTALIA | Complete Executive Project – LT 500 kV – SE Coletora – SE Arinos |
VOLTALIA | Complete Executive Project – SE Serra do Mel Expansion – Installation of TR4 500/34,5 |
Client | Enterprise |
---|---|
SIEMENS / BRASNORTE | SE JUBA – 230 kV |
SIEMENS / BRASNORTE | SE BRASNORTE – 230 kV |
ETEM | SE CUIABA – 230 kV |
ETEM | SE NOBRES – 230 kV |
ETEM | SE NOVA MUTUM – 230 kV |
ETVG | SE VÁRZEA GRANDE – 230 kV |
TAESA | Expansion SE RIO GRANDE II 230/138kV |
São Pedro Transmissora | Exp SE GILBUÉS II 500kV |
São João Transmissora | SE SJP 500kV + Exp |
Triângulo Mineiro Transmissora (FURNAS) | SE Assis – 500 kV |
Triângulo Mineiro Transmissora (FURNAS) | SE Marimbondo II – 500 kV |
São Pedro Transmissora (AMBAR/ TAESA) | SE Barreiras II – 500/230 kV |
São João Transmissora (AMBAR / TAESA) | SE São João do Piauí – 500 kV |
LEST ( Vinci Partners) | SE XINGÓ/ JARDIM / PAULO AFONSO / LUIZ GONZAGA – (Assembly and Commissioning) |
Interligação Elétrica Aimorés | SE PADRE PARAÍSO 2 – 500kV –Lote 4 Leilão Aneel 013/2015 |
Água Vermelha Transmissora (Vinci) | SVC – Lote 5 – Leilão Aneel 013/2015 |
TAESA | SE BARREIRAS II – Authorization Resolution for the implantation of the second transformer bank 500/230kV 150MVA |
Assú Transmissora de Energia S.A(CEPAR) | SE ASSÚ 500KV – Implementation of 2 Transformer Banks 500/230KV 1.800 MVA + 3 Sectioning (2 CHESF e 1 TAESA) |
VOLTALIA | SE SERRA DO MEL – Construction and Assembly of a 500kV bay with a 500/34,5kV Transformer and 36 feeders |
CCINFRA / EDP | SE CHACHOEIRA PAULSITA. Electromechanical Assembly and Commissioning |
CCINFRA / EDP | SE ESTREITO . Electromechanical Assembly and Commissioning |